Section 6.11 of the CRESS Guidelines outlines that "The EUC shall carry out the billing process and issue the relevant bill to the Green Consumer based on meter readings at both RED (MRED) and Green Consumer (MGC) premises. The meter reading at RED and Gr
Answer: Billing Period refers to the monthly bill starting from the 1st of the month until the end of the month. The same Billing Period will be used for :-
i. TNB bills the GC for the maximum demand and balance of energy
ii. TNB bill RED for backfeed usage
iii. SB bill RED for SAC
Yes, the power delivered by the RED to TNB at 12 noon can be consumed by a Green Consumer at 3 pm that day, or another later time during a day within that month's Billing Period.