Clause 8.3: LCSP installed capacity shall not be less than 100kWp and not exceeding 2MWp per 11kV feeder, subject to the power system study and have a Direct Connection to the Electricity Supply Network at low voltage. a) How does Interconnection Solar sh
a) Solar output shall be directly connected to the Electricity Utility Company (EUC) and follow a similar connection like Feed-in-Tariff (FiT) to EUC LV grid i.e., solar connection before EUC supply meter.
b) LCSP installed capacity can be spread on different PE as long as it complies with the 2MWp cumulative per 11kV feeder.
CREAM
Clause 8.1: LCSP must be located within residential properties, specifically on landed houses. Multi-dwelling units such as condominiums or apartments are not eligible under this criterion. How about townhouse? Is it considered as landed?
Can homeowner be part of LEGA?
Further to the guideline released, can we ask if ST can provide a sample single line diagram to understand how the wiring needs to be done up for a CREAM project as we are not sure if it might follow a FIT regime or we will need to aggregate the cables an
Can a Homeowner only be from residential properties, while the LEGA can be an industrial or commercial entity? Am I correct?