Further to the guideline released, can we ask if ST can provide a sample single line diagram to understand how the wiring needs to be done up for a CREAM project as we are not sure if it might follow a FIT regime or we will need to aggregate the cables an
The LEGA must refer to EUC’s technical requirements for wiring and connection.
CREAM
Clause 8.1: LCSP must be located within residential properties, specifically on landed houses. Multi-dwelling units such as condominiums or apartments are not eligible under this criterion. How about townhouse? Is it considered as landed?
Can homeowner be part of LEGA?
Clause 8.3: LCSP installed capacity shall not be less than 100kWp and not exceeding 2MWp per 11kV feeder, subject to the power system study and have a Direct Connection to the Electricity Supply Network at low voltage. a) How does Interconnection Solar sh
Can a Homeowner only be from residential properties, while the LEGA can be an industrial or commercial entity? Am I correct?