Frequently Asked Questions

Energy Transition Program

CREAM

Clause 8.1: LCSP must be located within residential properties, specifically on landed houses. Multi-dwelling units such as condominiums or apartments are not eligible under this criterion. How about townhouse? Is it considered as landed? Clause 8.3: LCSP installed capacity shall not be less than 100kWp and not exceeding 2MWp per 11kV feeder, subject to the power system study and have a Direct Connection to the Electricity Supply Network at low voltage. a) How does Interconnection Solar sh Further to the guideline released, can we ask if ST can provide a sample single line diagram to understand how the wiring needs to be done up for a CREAM project as we are not sure if it might follow a FIT regime or we will need to aggregate the cables an Can a Homeowner only be from residential properties, while the LEGA can be an industrial or commercial entity? Am I correct? For CREAM scheme, is it possible to combine with the existing scheme such as NEM and SELCO for rooftop? For example, I house have the area to install up to 10kWp; and it shall be divided by 6kWp to be under NEM/SELCO, and balance 4kWp to be under CREAM sc Could we clarify on the agency/entity responsible for conducting the PSS are LEGA, TNB, or approved consultants? Is there any specific technical standards and guidelines must be followed for conducting a PSS? Which entity shall evaluate and approve the power study approval (TNB or ST)? To participate in CREAM, we need to register as NEDA participant which also require conducting the PSS, thus do we need to redo the PSS for CREAM after we register as NEDA participant? To participate in CREAM, PSS need to be conducted on 11kV substation area within Klang Valley?