How long is the duration to conduct PSS starting from first submission to final approval?
LEGA is advised to consult the EUC to obtain the expected timeline and requirements for their specific submission.
CREAM
Clause 8.1: LCSP must be located within residential properties, specifically on landed houses. Multi-dwelling units such as condominiums or apartments are not eligible under this criterion. How about townhouse? Is it considered as landed?
Can homeowner be part of LEGA?
Clause 8.3: LCSP installed capacity shall not be less than 100kWp and not exceeding 2MWp per 11kV feeder, subject to the power system study and have a Direct Connection to the Electricity Supply Network at low voltage. a) How does Interconnection Solar sh
Further to the guideline released, can we ask if ST can provide a sample single line diagram to understand how the wiring needs to be done up for a CREAM project as we are not sure if it might follow a FIT regime or we will need to aggregate the cables an
Can a Homeowner only be from residential properties, while the LEGA can be an industrial or commercial entity? Am I correct?