Is there a list of accredited or approved consultants provided by ST/TNB to conduct a PSS?
The PSS will be conducted directly by the EUC. LEGA is required to engage with the EUC for initiating the study. Please refer to Appendix 2 of the Guideline on the application process flow.
CREAM
Clause 8.1: LCSP must be located within residential properties, specifically on landed houses. Multi-dwelling units such as condominiums or apartments are not eligible under this criterion. How about townhouse? Is it considered as landed?
Can homeowner be part of LEGA?
Clause 8.3: LCSP installed capacity shall not be less than 100kWp and not exceeding 2MWp per 11kV feeder, subject to the power system study and have a Direct Connection to the Electricity Supply Network at low voltage. a) How does Interconnection Solar sh
Further to the guideline released, can we ask if ST can provide a sample single line diagram to understand how the wiring needs to be done up for a CREAM project as we are not sure if it might follow a FIT regime or we will need to aggregate the cables an
Can a Homeowner only be from residential properties, while the LEGA can be an industrial or commercial entity? Am I correct?