Frequently Asked Questions
Energy Transition Program · CREAM
Is there any designated area for PSS or LEGA can determine the location?
Can homeowner be part of LEGA?
Clause 8.3: LCSP installed capacity shall not be less than 100kWp and not exceeding 2MWp per 11kV feeder, subject to the power system study and have a Direct Connection to the Electricity Supply Network at low voltage. a) How does Interconnection Solar sh
Further to the guideline released, can we ask if ST can provide a sample single line diagram to understand how the wiring needs to be done up for a CREAM project as we are not sure if it might follow a FIT regime or we will need to aggregate the cables an
Can a Homeowner only be from residential properties, while the LEGA can be an industrial or commercial entity? Am I correct?
For CREAM scheme, is it possible to combine with the existing scheme such as NEM and SELCO for rooftop? For example, I house have the area to install up to 10kWp; and it shall be divided by 6kWp to be under NEM/SELCO, and balance 4kWp to be under CREAM sc
Could we clarify on the agency/entity responsible for conducting the PSS are LEGA, TNB, or approved consultants?
Is there any specific technical standards and guidelines must be followed for conducting a PSS?
Is there a list of accredited or approved consultants provided by ST/TNB to conduct a PSS?
How long is the duration to conduct PSS starting from first submission to final approval?